Learn More About MEP Coordination Drawings

By Jeffrey Stevens


Basically, coordination drawing also referred to as composite is crucial for successful building constructions whether institutional or commercial buildings. Generally, coordination involves avoiding the physical conflict when preparing the equipment with a building, as well as procedures for duct piping and building systems. The risk is usually prominent during a building project with many mechanical, plumbing, and electrical needs. Therefore, it is necessary to include the MEP coordination drawings within the site.

Essentially, MEP stands for Mechanical, Electrical, and Plumbing. Hence, these designs are utilized in order to decrease problems among different trades. For instance, in the case where there are subcontractors negotiating with one another. The competent drawings operate as a major planning instrument that will allow for smooth installation of each material.

After all the elevations have been well-established, the designs are then made. For example, the HVAC, piping, fire protectors and electrical among others are all arranged as one. Upon completing, meeting as well as approval, the subcontractors create their own comprehensive shop drawing representation which will be dependent on the area they are handling at the time.

If one recruits an effective firm that is efficient in this process, they are able to save a lot of time spent in the construction hence save a lot of money and make profits. This is crucial as very many construction sites tend to make more loss than profits. However, the quality of the drawings are different and varying from one coordination firm to another. Hiring non-professionals to save money tends to be costly as more problems emerge as the process progresses. This tends to delay the project and create more confusion.

To ensure the firm is efficient, it is important to have the knowledge involving MEP coordination tool since there is design knowledge. When applied, this tool ensures the project is in line with the set codes, as well as standards. The design detailers and engineers are often consulted on this, and involves routing property, location, configuration, and function.

Additionally, there is the construction knowledge. This assists in guaranteeing the practicability of the building as well as efficient field activities. It involves information on access requirements, configuration, construction method and safety. In this field, engineers and foremen are in charge of providing this information.

On the other hand, the main areas that are included in MEP process are normally the most crucial systems of a building. One of such system is the HVAC system that includes heat generation, cooling systems, air handling, as well as the automatic monitoring system. This helps to ensure air is always conditioned. Another area is fire protection system that help to ensure the building is fire resistant, and fast on fire warning.

Moreover, the electrical system includes supply, lighting, and distribution. Again, there is the plumbing system which works on pumped waste and pressure driven systems among others. Finally, there is the process of piping system and the datacom or telephone. Therefore, there is need for MEP coordination in buildings to avert more destruction or additional costs.